Shipbuilding
Shipbuilding facilities have recently been enhanced to continue using modern methods of undercover ring construction
Oil and Gas Construction
Swan Hunter maintains its decades of offshore oil & gas capability by designing, fabricating and constructing projects.
Decommissioning
Swan Hunter has been involved in the decommissioning of offshore platforms and structures since 1996.
..
Ship Conversion

Swan Hunter successfully completed the conversion of the world-largest pipelying vessel 'Solitaire' for the Allseas Group in 1998. The project brought together first class innovative systems with the most advanced equipment to meet the highly challenging design criteria of the client, setting new standards for the pipeline installation industry. Prior to delivery of the stripped down bulk carrier hull, Swan Hunter carried out all the re-engineering preparations to identify, produce and later install all the piping, electrical, HVAC and control systems required to turn the vessel into a highly mechanised pipeline production facility with 400 man accommodation.

The project required extensive re-engineering, subcontract management control and a skilled workforce to complete fabrication and installation of over 9000 ton of new steelwork, 3000 ton of large and small bore piping, installation of 4000 ton of mechanical equipment and 1200 km of electrical and control system cabling. Swan Hunter carried out all testing and commissioning and assisted also with the extensive sea trial and pipelay testing programme.